"Share a Gift with the Angels"
August 12, 2008
Aboitiz Energy Solutions, Inc. (AESI) celebrated its 10th Year Anniversary with the kids of the Reception and Study Center for Children (RSCC) in Quezon City. Last August 4, the team was welcomed with warm hugs and kisses from the kids who were currently living within the care of the Department of Social Welfare and Development - NCR.
AESI-DOLE PHILS. INC. MOA SIGNING
August 6, 2008
After years of negotiation, Aboitiz Energy Solutions Inc.(AESI) and Dole Phils., Inc. (DOLEPHIL) has finally signed the memorandum of agreement last Aug. 6, 2008 at DOLEPHIL executive conference room for the improvement of Dole-Cannery’s power factor, an energy efficiency service that will be provided by AESI.
"Bulig sa Carles" Relief Operation
July 5, 2008
After Typhoon Frank strongly hit most part of the Southern Philippines last week of June of which Iloilo was mostly affected, Aboitiz Energy Solutions, Inc. (AESI) has been very grateful to help our fellow Ilonggo’s to revive from a calamity which caused great damage to their community leaving them homeless and out of food.
PANELCO III PF MOA SIGNED
June 12, 2008
The Memorandum of Agreement for Power Factor Correction has been signed on June 12, 2008 by Pangasinan III Electric Coop., Inc. (PANELCO III) President Solomon B.Villa for the coop and Vice President and COO Benjamin A. Cariaso, Jr. for AESI.
AESI and PFMC MOA Signing for Power Factor Correction
March 26, 2008
On March 26, 2008, Mr. Aaron O. Berin, General Manager of AESI and Mrs. Aileen Crystel U. Ongkauko, President of phil. Foremost milling Corp. (PFMC) signed a Memorandum of Agreement for the installation and maintenance of capacitor banks to raise the power factor of PFMC from 92.26% to as high as 99%.
Copyright © 2008. Aboitiz Energy Solutions. All Rights Reserved.